The following list of road/lane closures and alerts is reprinted from the Cobb County Department of Transportation’s Weekly Travel Advisory for the week of May 7-13, 2022. All scheduled work is subject to change depending on weather conditions.

ALERTS

  • Dallas Highway/Whitlock Avenue/SR 120 – Significant delays are expected along Dallas Hwy / Whitlock Ave between John Ward Road and Cheatham Hill Dr. Crews will work in the area from 9 a.m. to 4 p.m. weekdays. Road capacity will be reduced to one lane. Delays are expected to worsen in the afternoon heading west. Alternate routes are recommended.
  • SR 360/Powder Springs Street – Powder Springs Street Improvements – Marietta Town Project: Expect delays and daily lane closures along Powder Springs Street between Sandtown Rd and South Marietta Pkwy. Expected completion: March 2023. For construction information, call the project line at (770) 794-5629. For questions regarding transit service, call (770) 427-4444.
  • SR 5/Township Highway Connector to I-75 – Contractors from the Georgia Department of Transportation (Georgia DOT) will install lane closures on SR 5 / Canton Road Connector at I-75 this weekend in Cobb County. Weather and site conditions permitting, a left lane will be closed on the northbound SR 5/Canton Road Connector overpass on I-75 from 10:00 p.m. Friday, May 6 to 5:00 a.m. Monday May 9.
  • SR 360/Macland Road from New Macland Road/Cobb to SR 120/Paulding – Project GDOT #0006049/Widening: speed reduction in place within project limits from 45 MPH to 40 MPH for the rest of the construction. Expect daily lane closures between 7 a.m. and 7 p.m. In addition, contractors will work day and night shifts on weekends. The project is expected to be completed in November 2023. For more information, please call (404) 631-1023.

ROAD CLOSURE INFORMATION

  • Karls Gate Dr (from Princeton Lakes to Middlebury Ct) – Cobb DOT Road Closure – Karls Gate Drive is closed to traffic from Princeton Lakes Drive to Middlebury Court due to a failing storm sewer. The current ETA to reopen is unknown. For more information, call (770) 528-1600.

LANE CLOSURE INFORMATION

  • Buckner Rd (Veterans Memorial to Rosie Ln) – Cobb DOT lane closure – Possible daily lane closures from 9 a.m. to 4 p.m. Monday through Friday along Buckner Road from Veterans Memorial Parkway to Rosie Lane while crews work to complete the sidewalk project from Buckner Road (X2766). Expected completion: November 2022. For more information, call (770) 528-1653.
  • Canton Road to Shallowford/Highland Terr – Cobb DOT lane closure – Daily lane closures possible from 9 a.m. to 4 p.m. Monday to Friday near the intersection of Canton Road with Shallowford Road and Highland Terrace as crews work to complete improvement projects Cobb DOT in this area (X2304 and X2602). Expected completion: January 2023. For more information, call (770) 528-1653.
  • Cheatham Hill Rd (John Ward to Powder Springs Rd) – Cobb DOT lane closure – Possible daily lane closures from 9 a.m. to 4 p.m. Monday through Friday along Cheatham Hill Road, John Ward Road to Powder Springs Road, while crews work to complete this section of pedestrian improvements from Kennesaw Mountain (X2404). Expected completion: summer 2023. For more information, call (770) 528-1653.
  • Circle 75 Pkwy at Windy Hill – Cobb DOT lane closure – Daily lane closures possible from 9 a.m. to 4 p.m. Monday through Friday near the intersection of Circle 75 Parkway and Windy Hill Road while crews work on this improvement project from the road (X2328). Big delays are sometimes possible. Expected completion: summer 2022. For more information, call (770) 528-1653.
  • Dallas Hwy/Whitlock Ave (from John Ward to Cheatham Hill) – Cobb DOT lane closure – Possible daily lane closures from 9 a.m. to 4 p.m. Monday through Friday along Dallas Highway/Whitlock Avenue from John Ward Road to Cheatham Hill Road while crews work to complete this section of pedestrian improvements from Kennesaw Mountain (X2404). Big delays are possible. Expected completion: summer 2023. For more information, call (770) 528-1653.
  • Hillcrest Dr (Shenandoah Tr to Six Flags Pkwy) – Cobb DOT lane closure – Possible daily lane closures from 9 a.m. to 4 p.m. Monday through Friday along Hillcrest Drive from Shenandoah Trail to Six Flags Parkway as crews work to complete the Hillcrest Drive Sidewalk project (X2764). Expected completion: Fall 2023. For more information, call (770) 528-1653.
  • Mableton Pkwy (Factory Shoals to Discovery Blvd) – Cobb DOT Lane Closure – Possible daily lane closures from 9 a.m. to 4 p.m. Monday through Friday along Mableton Parkway from Factory Shoals to Discovery Boulevard while crews work to complete pedestrian improvements to Mableton Parkway ( X2762). Expected completion: January 2023. For more information, call (770) 528-1653.
  • Robinson Rd (Roswell Rd to Holt Rd) – Cobb-Marietta Water Authority daily lane closures are in effect from 9 a.m. to 4 p.m. along Robinson Road from Roswell Road to Holt Road as crews work to complete the Blackjack Mountain project. Questions should be directed to CCMWA (direct hotline: 770-514-5201) /email:[email protected]).
  • Rockcrest Ct (Rockcrest Way to Rockcrest Dr) – Cobb DOT Road Closure – Rockcrest Court is closed to through traffic from Rockcrest Way to Rockcrest Drive due to failed sumps and cross drains. Repairs are estimated at 30 days. Expected completion: July 2022. For more information, call (770) 528-1653.
  • Sandtown Road (Westside Road to Austell Road) – Cobb DOT lane closure – Daily lane closures possible from 9 a.m. to 4 p.m. Monday through Friday along Sandtown Road from Westside Drive to Austell Road as crews work to complete the road improvement project the Cobb DOT road (X2610). Expected completion: Spring 2023. For more information, call (770) 528-1653.
  • Sandy Plains Road (Shallowford Road to Alabama Road) – Cobb DOT lane closure – Nightly lane closures possible from 7 p.m. to 5 a.m. Sunday through Thursday along Sandy Plains Road from Shallowford Road to Alabama Road for resurfacing (B2905). One lane will remain open during paving operations. Expected completion: summer 2022 (progress depends on weather conditions). For more information, call (770) 528-1653.
  • SR 360 / Powder Springs Road from Windy Hill Road to Sandtown Road – GDOT weekend rolling lane closures are in effect from Friday 9 p.m. to Monday 5 a.m. due to resurfacing activities (Project #M005996). The work carried out and the progress depend on the weather conditions. Expected completion: Spring 2022. For more information, call (770) 514-5300.
  • SR 360/Macland Rd (New Macland Rd/Cobb to SR 120/Paulding – GDOT Lane Closures (Project #0006049 / Widening) – Daily lane closures from 7 a.m. to 7 p.m. Monday through Friday and daily and nightly lane closures on weekends. Speed ​​reduction is in place within the boundaries of the project. Expected completion: November 2023. For more information, please call (404) 631-1023.
  • SR 360/Powder Springs Street from Sandtown Road to South Marietta Parkway – City of Marietta daily lane closures in effect related to Powder Springs Street improvements. Expected completion: March 2023. For construction information, call the project line at (770) 794-5629. For questions regarding transit service, call (770) 427-4444.
  • SR 92/Lake Acworth Drive from SR3/US 41/Cobb Pkwy to Glade Road – Daily GDOT lane closures are in effect on Saturdays from 7 a.m. to 6 p.m. due to construction related to GDOT project 0006862. GDOT road closure is in effect at the intersection of Collins Circle and SR92 /Lake Acworth Drive. Motorists should follow the posted detour for the road closure (expected to last until 12/2022). Expected completion of the project: 3/2023. For more information, please call (404) 631-1023.
  • SR5/Township Rd Conn to I-75 – GDOT Lane Closures – Possible lane closures along the Canton Road Connector from 10 p.m. to 5 a.m. Monday through Sunday in connection with the I-75 Bridge Rehabilitation Project (M006029). I-75 lane closures are also in effect from 10 p.m. to 5 a.m. For more information, please call (404) 631-1023. Expected completion: October 2023
  • Terrell Mill Rd to Bentley Rd – Cobb DOT Lane Closure – Possible daily lane closures from 9 a.m. to 4 p.m. Monday through Friday near the intersection of Terrell Mill Road and Bentley Road as crews work to complete the Cobb DOT Windy Hill/Terrell project Mill Connector (X2401). Expected completion: October 2022. For more information, call (770) 528-1653.
  • Windy Hill Rd (from Benson Poole to Atlanta Rd) – City of Smyrna lane closures are in effect from 9 a.m. to 4 p.m. Monday through Friday due to construction related to the Windy Hill Boulevard project. Big delays are possible. Exercise caution in this area. For more information about this project, contact the Smyrna Public Works Department at (770) 431-2850 or visit the City of Smyrna website.
  • Windy Hill Road (Spectrum Cir/Interstate North) – Cobb DOT Lane Closure – Possible daily lane closures from 9 a.m. to 4 p.m. Monday through Friday near the intersection of Windy Hill Road with Spectrum Circle/Interstate North Parkway as crews work to complete the Cobb DOT Windy project Hill/Terrell Mill Connector (X2401). Expected completion: October 2022. For more information, call (770) 528-1653.

>> To see other coverage of the Cobb Department of Transportation from the Cobb County Mail, follow this link

About admin

Check Also

Booking.com intends to issue a warning for accommodation in the occupied West Bank

JERUSALEM: Online travel agency Booking.com said Monday it would add disclaimers to listings in the …